













 |
|
New Project of
Mataji Ni Gadi & Rajbhog Kitchen

At the cost of about Rs.34.77 lakhs, Shri. Arasuri Ambaji Devasthan Trust
is now going to renovate the above shown holy place of
Mataji ni Gadi, with a big hall, containing the old place of
Gadi of Mataji and the holy water for the bath of the Mataji in Nij
Mandir and the Prasadi Centre of the priest Bhattaji. Again Shri Arasuri Ambaji
Mata Devasthan Trust
is also going to construct a two storied staff rooms and residences
for the temple priests and also to replace the present above shown
prasad gruh, with a big Rajbhog Kitchen, away from Nij Mandir
below Chachar Chowk.
 |
  
Shri. Ambaji Development Committee of Shri Arasuri Ambaji
Mata Devasthan Trust
of Ambaji was founded in 1972 & it had
recommended to renovate the total Ambaji temple complex. Therefore
in the year 1975, on the basis of various recommendations of
Shri. Ambaji Development Committee, the temple trust has initiated the
long lasting giant works of a total renovation of the temple complex,
which has been scheduled to be concluded in three parts, phases and
period of time.
In the beginning during the period
of 1975 to 2004, from the first phase of this project, Shri Arasuri
Ambaji Mata Devasthan Trust has constructed and renovated in the inner
parts of the Main Temple Nij Mandir, replacing the old structures,
floors, domes and ceilings totally with the beautiful piece of
marble and wonderful piece of carvings as per the Shashtras and
religious rituals, keeping the Old Gokh and Visa Chakra intact. In
the second phase of the renovation project, the whole temple work is
completed.
At present in the last phase of renovation
project, the outer parts of the Temple Complex and its
surroundings, mainly the Havan Shala, Mataji Ni Gadi, Bhojan Shala in
chachar chowk area are under construction
and renovation
at the cost of about Rs.1 crores. It is decided that every inch of this
place is going to be replaced with marbles in a quite artistic marvelous
architectural designing. |
 |
Proposed New Projects
Ambaji
Darshan Path
Development Zone |
Shri. Arasuri Ambaji Mata Devasthan Trust has proposed to get
declared the whole area of about 10 sq. meter around the city Ambaji as
a Development
Zone, in order to facilitate the flow of increasing tourists coming
to Ambaji everyday. The Trust intends to develop a big road of 700
meters from Trivedi Circle to Shakti Chowk at the cost of Rs.157
lakhs in first phase, another roads from college to Trivedi Circle
and from Kailash Tekari to Trivedi Circle at about 2 kilometers in
leangth at the cost of Rs.237 lakhs in 2nd phase, in order to
Develop these Darshan Paths with all essential public facilities, and infrastructural networks
of railing, street lights, dust
bins, landscape plantations, Benches, Foot Path etc.
Entrance Gates of Ambaji
Shri. Arasuri Ambaji Mata Devasthan Trust has also planed to
construct three Giant Entrance Gates carved from marbles, on each entry
points to city of Ambaji from each three highway roads, such as one on Himmatnager Highway, second on Data Highway and third on Abu Road
Highway at the cost of about Rs.219 lakhs with the Ambaji Map and
other information sign boards and garden surroundings for the
facility of the tourists. |
|
|
Ambaji Heritage
Cottages Project
On the way to Holly Gabber Hill, within
an area of about 10 acres of lands, bearing S.No.2 on a hill side area,
near the temple complex, The Trust has now decided to develop a
beautiful site of Ambaji Heritage Centre
along with a wonderful architectural construction works in marble,
providing 60 super Deluxe deluxe and semi deluxe rooms, garden,
swimming pool, restaurant, Tennis as well as Badminton Courts, Cafe,
Change Rooms, Path Ways, Meditation Cottage, Parking, Sun Bath Area,
Amusement Park, Water and Drainage Systems, entrance, compound wall and
many more amenities and tourist facilities, just at the cost of
Rs.517.5 lakhs at present.
New Project of Total
Renovation of Old Cottage Hospital Building

The Ambaji
Shaktipathi is located within Danta taluka tribal belt. Since last
forty years Shree Arasuri Ambaji Mata Devasthan Trust, Ambaji has
provided medical facility to more than eighty-five thousand patients
in this tribal area. The present Cottage Hospital is approximately
45 to 50 years old. The steel is corroded and roofs are ruined. In
rains there is leakage from roofs. It is due to this reason it is
proposed to demolish the old Cottage Hospital and make new Hospital
with better facility for patients. Patients from Gujarat and
Rajasthan come to Cottage Hospital from around appropriately 6000
sq. Km far and wide. From day to day increasing population of
patients and the conditions prevailing at old Hospital it is planned
to shift to new location for New Hospital with modern equipments in
the interest of increasing number of patients. It is now proposed
that the New Hospital of Ambaji will have 200 beds;12 special rooms;
10 semi-AC rooms; 6 OPDs; 10 visiting Doctors’ Room; emergency unit;
ICUs; CCU Units; different wards like orthopedic, ophthalmic, gynec,
septic, surgical , burns , endoscope , T.B. etc .Cafeteria , clock
room , rest rooms , toilets , medical stores , laundry , electric
yard , D.G.Set , Gas supply , Oxygen and Blood Banks . This New
Hospital building will cost approximately Rs: 6.39 crore, as a whole, in order to provide latest, effective
and instant medical services to all the tourists, pilgrims and all
other people of Ambaji as well as to the poor people of tribal area
in surroundings. |
|
Ambaji Gabbar Pradakshina Path
The
path which circles Gabbar Hill will have width of 15 feet and 2.5 Km
in length is proposed which will attract pilgrims in large numbers.
This Gabbar circling path will have facilities for pilgrims such as
sitting arrangements, snacks counter, drinking water, small spots to
store water, hanging swings, bridge and developing view points which
looks to beautiful landscape. Moreover, at definite interval
different installation of 51 temples of 51 Shaktipiths with details
about their locations and significance is proposed. The Government
of Gujarat has sanctioned Rs: 3.21 crore in the letter of Government
– Ref: PVS-112006-191-Y , dated 21 – 02 – 2006
|
The circling path of Gabbar Hill which will
consist 51 decorated umbrellas for 51 Shakthpith Temples.
Marble slab bed for Idols with marble Idols. The stand and
description marble plate for all 51 the Shaktipith.
|
15 feet wide well designed concrete block
pathway. Resting places, drinking water storage, toilets,
sitting arrangements, water pipeline and sump wells .
|
|
Decorative wire fencing. |
Sunset Point, Watch Tower and amusement park.
|
|
Small streams and lakes for water storage.
|
The renovation of Hanuman temple near
entrance Gate. |
|
Hanging bridge and swings, garden with
flowers and green plants, the road joining to the steps and
circling path of Gabbar Hill. |
Security point, Guffa development, the
entrance and exit Gate of Pradakshina Marg of Gabbar Hill
will be made from Bansi Pahanpur stone. |
|
|














 |
|